Commits
Rik van Riel committed ca28aa53dd9
sched/numa: Fix task or group comparison This patch separately considers task and group affinities when searching for swap candidates during NUMA placement. If tasks are part of the same group, or no group at all, the task weights are considered. Some hysteresis is added to prevent tasks within one group from getting bounced between NUMA nodes due to tiny differences. If tasks are part of different groups, the code compares group weights, in order to favor grouping task groups together. The patch also changes the group weight multiplier to be the same as the task weight multiplier, since the two are no longer added up like before. Signed-off-by: Rik van Riel <riel@redhat.com> Signed-off-by: Mel Gorman <mgorman@suse.de> Cc: Andrea Arcangeli <aarcange@redhat.com> Cc: Johannes Weiner <hannes@cmpxchg.org> Cc: Srikar Dronamraju <srikar@linux.vnet.ibm.com> Signed-off-by: Peter Zijlstra <peterz@infradead.org> Link: http://lkml.kernel.org/r/1381141781-10992-55-git-send-email-mgorman@suse.de Signed-off-by: Ingo Molnar <mingo@kernel.org>